- Home
- Guides
Guide
Do I Need Planning Permission for an Extension in Berkshire?
Most single storey rear and side extensions in Berkshire fall within permitted development rights and don't need a full planning application. But "most" isn't "all" — and getting it wrong means a stop-work notice or a retrospective application. Here's how we assess it, and what actually changes the answer.
Client Reviews
What Our Clients Say
“Pindi is an excellent tradesman. His attention to detail is second to none and he's a really nice guy to work with. Highly recommend.”
James Graham
“Pindi did a fantastic job with my kitchen. He understood my requirements from the start and I was very happy with the finished result. His workmanship was exceptional.”
Lisa Creek
“I used Pindi Sahota for a house conversion, all works were carried out professionally.”
Aniket Patel
Permitted Development: The Short Version
Permitted development rights let you build certain extensions without a full planning application, provided you stay within set limits on height, depth and proximity to boundaries. For a typical semi-detached or detached house, a single storey rear extension can usually extend up to 6 metres (detached) or 4 metres (semi/terraced) under current rules, within height limits of around 4 metres at the ridge, reducing to lower eaves heights near a boundary.
These rights are automatically restricted or removed entirely in some circumstances — most commonly where a previous planning condition removed them, where the property is listed, or where the house sits within certain designated areas.
When You Need Full Planning Permission
- ✓The property is in a conservation area — common in parts of Windsor, Eton, Reading town centre and several Berkshire village cores
- ✓The house is a listed building, or within its curtilage
- ✓A previous planning condition on the property removed permitted development rights (this happens more often than homeowners expect on newer estates)
- ✓The extension exceeds permitted development size/height limits
- ✓You want a double storey side extension — these typically require full planning regardless of other factors
- ✓The property has already had permitted development extensions that used up the available allowance
Berkshire's Six Planning Authorities
Berkshire is covered by six separate unitary planning authorities, each with its own local validation requirements and, in places, its own Article 4 Directions removing permitted development rights from specific streets or conservation areas: Bracknell Forest Council, Wokingham Borough Council, Reading Borough Council, West Berkshire Council, Royal Borough of Windsor and Maidenhead, and Slough Borough Council. Border towns like Virginia Water, Camberley, Gerrards Cross and Stoke Poges fall under Surrey or Buckinghamshire authorities instead.
How We Handle This
We check your specific permitted development position free of charge at the initial site visit, before any work is priced. Where full planning is needed, we manage the application and liaise directly with the relevant planning authority — this is included in how we scope and quote every project, not an extra line item that appears later.
FAQ
Related Questions
How long does a full planning application take in Berkshire?
Most Berkshire authorities aim to determine a standard householder planning application within 8 weeks, though in practice timelines can run longer for applications in conservation areas or where a case officer requests amendments.
Can my neighbour object to a permitted development extension?
A true permitted development scheme does not require neighbour consultation in the way a full planning application does, though the Neighbour Consultation Scheme (where it applies to larger rear extensions) does give adjoining owners a right to raise concerns about certain impacts.
What happens if I build without the right permission?
The council can issue an enforcement notice requiring alteration or removal of the work. We check your position before quoting specifically to avoid this ever becoming a risk on a project we've built.
Ready to Start Your Project?
Free written quote from your local Berkshire building contractor — usually within 10 working days, depending on the size of your project.